OP PRO BY DUP — END PHENOMENA - BULLETIN 24 OCTOBER 1971R

Ответить
auditor
Сообщения: 726
Зарегистрирован: 28 дек 2015, 12:01

OP PRO BY DUP — END PHENOMENA - BULLETIN 24 OCTOBER 1971R

Сообщение auditor »

BOARD TECHNICAL BULLETIN
24 OCTOBER 1971R
Issue I
Revised 2 January 1975
Remimeo
Tech & Qual
Level I Cksheet
HQS Course Super
Checksheet CANCELS
HCO BULLETIN OF 24 OCTOBER 1971
Issue II
SAME TITLE

ALSO MODIFIES
BTB 9 OCTOBER 1971R
LEVEL I DRILL (Page 13, No. 9)



OP PRO BY DUP — END PHENOMENA

Exteriorization is an EP for the process Opening Procedure by Duplication, but is not the only EP. The reason Op Pro by Dup had an EP of exterior was because we didn’t have Int-Ext then, and to end it off on the first exteriorization.

The EPs for Op Pro by Dup include:

A. Flattened Comm lags and no more change on the process (per PAB 48).

B. A real big win with F/N VGIs and ability regained (per HCOB 20 Feb 70, „Floating Needles and End Phenomena“).

C. Exterior with an F/N, Cog, VGIs.

In the presence of heavy overts, its possible that a pc won’t exteriorize on Op Pro by Dup.

Overts are handled on Exp Grade II. Op Pro by Dup could grind on and on for as long as 50 hours with no change in an attempt to run it to Ext, when it’s an out Grade II.


Taken from an LRH C/S
Reissued by Flag Tech Compilations
for CS-4, W/O Ron Shafran

Approved by
L. RON HUBBARD
Founder
for the Boards of Directors
of the Churches of Scientology

BDCS:LRH:RS:LG:rs:jh
Professional auditing in any place on the planet http://timecops.net/english.html http://0-48.ru https://www.facebook.com/Galactic_Patro ... 206965424/ Auditor class X, skype: timecops
Ответить

Вернуться в «L Ron Hubbard original HCO BULLETINS, POLISIES»